The project team installed a rack‑supported mezzanine engineered for maximum cubic utilisation, creating Ground + 2 levels and reaching 8.9 m in total height. The system provides 19,152 carton positions, enabling better SKU organisation, faster picking, and consolidated storage across dedicated levels.
Fully supported by the racking structure—without requiring a building‑supported mezzanine—it reduces installation complexity while ensuring stability, safe load distribution, and long‑term durability. Custom staircases, decking, pallet drop zones, and safety gates further optimise access and workflow across all three levels.